Skip to content
NORTHPEAK NorthPeak Developments home page

Homes and renovations

More light, more room, planned for Alberta seasons.

A sunroom adds living space and daylight. How comfortable it is in January and July depends on decisions made before it is built: the foundation, the glazing and whether it is heated. We plan those with you first.

Illustrative image detail. Not a completed NorthPeak project.
Suits you if
You want a brighter room that connects the house to the yard, and a plan for how and when you will use it.
To scope it, we need
  • Your address and municipality
  • Which rooms or areas are in scope
  • The season or date you would like to be finished by

What usually prompts the call

Common concerns

  • You want more daylight and a room that opens to the yard.
  • You are unsure whether you need a three-season or a four-season room.
  • You have seen sunrooms that are too hot in summer and unusable in winter.
  • You do not know whether your lot or deck can take an addition.

What NorthPeak does about it

  • A first conversation about how and when you will use the room.
  • A site check of the wall it attaches to, the ground or deck beneath it, and drainage.
  • A written scope that names the foundation, framing, glazing and heating.
  • One contract covering the structure, the tie-in to the house and the finishes.

What is in the scope

In a typical scope

  • Site visit and measurements
  • Foundation or structural support suited to the design
  • Framing, roofing and tie-in to the existing house
  • Windows, doors and glazing
  • Coordination of electrical and heating trades where the scope includes them
  • Interior and exterior finishing

Options to discuss

  • Three-season room
  • Four-season room, insulated and heated
  • Conversion of an existing deck or covered patio
  • Glazing type and how much of it opens
  • Flooring and ceiling finishes

Your own scope is written for your house and may differ from this list.

What shapes the plan and the price

Cost drivers

  • Size of the room
  • Three-season or four-season construction
  • Foundation type and ground conditions
  • Amount and type of glazing
  • Heating, cooling and electrical work
  • How the roof ties into the existing house

Permits and inspections

A sunroom is an addition to the house and normally needs a building permit, with electrical or gas permits depending on the work. Your municipality also sets how close an addition can be to the property line. We confirm the requirements for your address, and your scope states who applies for each permit.

We do not publish price ranges, because a range wide enough to be true is too wide to be useful. You receive a written estimate after a site visit, as a fixed price or a cost-plus contract.

How the work runs

  1. Step 1 · First

    Consultation and site visit

    We listen to what you want, look at the house and take measurements and photos. You learn what is feasible before you spend anything on design.

  2. Step 2 · After the site visit

    Design decisions

    We settle the size, the season rating, the glazing and the foundation with you, because these decide both comfort and cost.

  3. Step 3 · After the site visit

    Written scope and estimate

    You receive a written scope that lists the work, the materials and the allowances. The estimate follows the scope line by line, so you can see what each part costs.

  4. Step 4 · Before any work starts

    Contract and schedule

    The contract sets the price structure, the payment schedule, how changes are approved and who is responsible for each permit. A written schedule comes with it.

  5. Step 5 · Before construction

    Permits and ordering

    Permit applications go in and windows and doors are ordered, since glazing often has the longest lead time.

  6. Step 6 · In suitable weather

    Construction

    Foundation, framing, roof tie-in, glazing and finishing follow in sequence, with inspections booked at the stages your permit requires.

  7. Step 7 · At completion

    Walkthrough and closeout

    We walk the finished work with you, list anything outstanding and complete it. You receive the inspection records and warranty documents that apply to your project.

Sunrooms: common questions

What is the difference between a three-season and a four-season sunroom?

A three-season room is not built to be heated through an Alberta winter. A four-season room is insulated, glazed and heated as part of the house. The second costs more and has to meet more requirements.

Can you build a sunroom on my existing deck?

Sometimes. It depends on whether the deck structure and its footings can carry the load. We check that on the site visit and tell you plainly.

Do I need a permit for a sunroom?

In most cases, yes, because it is an addition. Your municipality decides, and we confirm it for your address before the contract is signed.

What happens if you find something unexpected?

Work stops on that item. We show you what we found, explain the options and give you a written price for each. Nothing extra is built or billed until you approve it in writing.

Can you give me a price over the phone?

Not an honest one. Cost depends on the size and condition of the house, the finishes you choose and what the permits require. After a site visit you receive a written estimate tied to a written scope.

Related services

Plan your project

Ready to talk about sunrooms?

The service is already chosen. Add your municipality and when you would like to start, and we write the message to Gurdeep Singh. You read it, change it and send it.

Gurdeep Singh

Plan your project in four short steps

Your message goes to Gurdeep Singh on 587 896 0002. You review it and press send.

3. When would you like to start?
Your message will appear here once you have made all three choices.

Still to choose: a municipality, a timeline.

WhatsApp opens in a new tab with the message filled in. Nothing is sent until you press send.

CallWhatsAppPlan your project