Exteriors
New siding is only as good as the wall behind it.
Siding is the visible part of your wall. The layers behind it keep water out. We replace or repair siding with attention to both.

- Suits you if
- Your siding is damaged or worn and you want the wall beneath checked before it is covered.
- To scope it, we need
- Your address and municipality
- Photos of the problem area or the whole elevation
- What prompted the call: damage, age or appearance
What usually prompts the call
Common concerns
- Cracked, dented or faded siding.
- Hail damage on one or more elevations.
- Gaps and loose panels that let water behind the wall.
What NorthPeak does about it
- An elevation-by-elevation assessment with photos.
- Repair where a match is possible, replacement where it is not.
- Sheathing and wrap checked before new siding is installed.
What is in the scope
In a typical scope
- Removal and disposal of old siding
- Inspection of sheathing and weather barrier
- New siding, trims and flashings
- Sealing around windows, doors and penetrations
- Site cleanup
Options to discuss
- Vinyl siding
- Fibre cement siding
- Engineered wood siding
- Partial replacement by elevation
Your own scope is written for your house and may differ from this list.
What shapes the plan and the price
Cost drivers
- Wall area and house height
- Siding material
- Condition of sheathing found underneath
- Number of windows, doors and corners
Permits and inspections
Siding replacement often needs no permit. We confirm this for your municipality.
We do not publish price ranges, because a range wide enough to be true is too wide to be useful. You receive a written estimate after a site visit, as a fixed price or a cost-plus contract.
How the work runs
Step 1 · First
Consultation and site visit
We listen to what you want, look at the house and take measurements and photos. You learn what is feasible before you spend anything on design.
Step 2 · After the site visit
Written scope and estimate
You receive a written scope that lists the work, the materials and the allowances. The estimate follows the scope line by line, so you can see what each part costs.
Step 3 · Before any work starts
Contract and schedule
The contract sets the price structure, the payment schedule, how changes are approved and who is responsible for each permit. A written schedule comes with it.
Step 4 · Weather permitting
Installation
Old siding comes off, the wall is checked and repaired where needed, and new siding is installed.
Step 5 · At completion
Walkthrough and closeout
We walk the finished work with you, list anything outstanding and complete it. You receive the inspection records and warranty documents that apply to your project.
Siding: common questions
Can you replace just the damaged side?
Yes, if a matching product is still available. Older siding can be discontinued or faded, and we tell you when a match will be visible.
Which siding material is best?
Each has trade-offs in cost, impact resistance and upkeep. We set those out so you can choose.
What happens if you find something unexpected?
Work stops on that item. We show you what we found, explain the options and give you a written price for each. Nothing extra is built or billed until you approve it in writing.
Related services
Plan your project
Ready to talk about siding?
The service is already chosen. Add your municipality and when you would like to start, and we write the message to Gurdeep Singh. You read it, change it and send it.
Gurdeep Singh
Plan your project in four short steps
Your message goes to Gurdeep Singh on 587 896 0002. You review it and press send.
Still to choose: a municipality, a timeline.
WhatsApp opens in a new tab with the message filled in. Nothing is sent until you press send.